• The Karot Hydroelectric Power Plant, which was first located along the CPEC, was put into commercial operation in Pakistan.
    The Karot Hydroelectric Power Plant, which was first located along the CPEC, was put into commercial operation in Pakistan.
    Karot hydropower station, the first hydropower project along the China-Pakistan Economic Corridor, was put into commercial operation on Wednesday. With an installed capacity of 720 megawatts, it can provide over 3 billion kilowatt-hours of clean energy each year, supplying electricity to about 5 million people in the country.

    The Karot Hydroelectric Power Plant, which was first located along the CPEC, was put into commercial operation in Pakistan.

    Karot hydropower station, the first hydropower project along the China-Pakistan Economic Corridor, was put into commercial operation on Wednesday. With an installed capacity of 720 megawatts, it can provide over 3 billion kilowatt-hours of clean energy each year, supplying electricity to about 5 million people in the country.

     

    The China-Pakistan Economic Corridor is a 3,000-kilometer-long route of infrastructure projects connecting northwest China's Xinjiang Uygur Autonomous Region and the Gwadar Port in the western province of Balochistan in Pakistan.

     

    Subscribe to us on YouTube: https://goo.gl/lP12gA

    Download our APP on Apple Store (iOS): https://apps.apple.com/us/app/cctvnews-app/id922456579?l=zh&ls=1

    Download our APP on Google Play (Android): https://play.google.com/store/apps/details?id=com.imib.cctv

    What's your reaction?

    Comments

    https://nexth.city/assets/images/user-avatar-s.jpg

    0 comment

    Write the first comment for this!